ORP probe for Frh evm

ORP probe for Frh evm

ORP-1-3-3688

High quality pH probe

•Extended lifetime thanks to their proven and exclusive technology

•You buy at the right price without any compromise as to quality

pH probe + connection cable for replacement on Astralpool devices

•For Frh evm 

Moderately priced probe

•No unnecessary intermediaries thanks to our short supply chain

•Pay the right price for logistics thanks to an optimized supply chain

The trademarks used on this website are the property of the manufacturers, the use of these trademarks is for the exclusive purpose of indicating the model for which each part is intended.

Hurry up! Only 499 still articles in stock.
€133.00
VAT included
Quantity

Available

Compatibility:

The pH probe is compatible with the Astralpool 's Frh evm regulator.

The quality :

Our high-quality pH probe allows you to accurately measure the ORP levels of your pool day after day. Its durable polycarbonate body in addition to its integrated protection for the pH glass measuring surface improve its wear resistance and as such extend its lifespan. In 82% of cases this is longer than 3 years. Its composition thus reduces maintenance costs while ensuring reliable readings in different environments.

Risk-free purchase:

Despite all the care we take to check compatibility we will reimburse you if the probe is not suitable: „compatible or reimbursed”

Don't forget the calibration and winterization solutions:

To ensure the probe’s measurement accuracy, it is often necessary to calibrate your control system. We offer a wide range of calibration solutions: READ

Your probe must be wintered in ideal conditions to optimize its lifespan. We offer a wide range of solutions for wintering: READ

Ready for immediate use:

Our probe is shipped inside a bottle containing a proprietary storage solution making it adapted for immediate use.

Very fast response time:

Its platinum measurement surface guarantees a fast response time and very stable value readings.

No maintenance required:

Its unique and robust design requires no maintenance.

Sustainable construction:

The probe’s polycarbonate body is designed for frequent use in the laboratory and in the field.

The offer’s limits:

Limited warranty of one year.

The offer is applicable to the probe only.

Photos and illustrations are informative and are not contractual.

The trademarks used on this website are the property of the manufacturers, the use of these trademarks is for the exclusive purpose of indicating the model for which each part is intended.

: ORP-1-3-3688
Hurry up! Only 499 still articles in stock.

Data sheet

Cable length
6 m
Diameter
12 mm
Length
150 mm
Type of connector
BNC
Junction characteristic
Pellon-HDPE
Reference solution
3.5 M KCl/KNO3
Service temperature range
0-60°C
Sensor body material
Polycarbonate
Weight
105 g
Span
-2000mV / +2000mV
Response time
95% in 1 second
Relative working pressure range
0-4 bar
Lifetime
1 year warranty. 3 years in most cases
Redox probe tip material
platinum
Chat
Avatar
Assistance
Fast reply We are currently offline
E-mail ph-redox-pool@ph-redox-pool.com